The Westermeerwind offshore wind farm is located nearby Urk in the Netherlands. As this wind farm is only 0.5 km away from shore, the 49 wind turbines can be witnessed on the coast
Ease of installation was requested by Ballast Nedam and realized by TME. The soft cover could be assembled within one hour by two persons. To simplify this process, the TP-covers were well-documented with a visualized step-by-step manual.
Key facts & figures
Offshore Wind Farm
Westermeerwind Offshore Wind Farm
Country
The Netherlands
Year
2014
Amount
48
Type
Soft cover
Contact
If it has not been built before, it can be built by TME.